AI & HPC
Infrastructure
Data center infrastructure for AI workloads. Power-dense facilities on renewable energy, built where grid capacity exists.
Power is the Bottleneck
Every AI company needs compute. Grid access in Europe takes 4 to 7 years. Data center construction can't keep up. We build on sites that already have grid connections, hydroelectric power, and cold-climate cooling. The infrastructure is ready, the power is available.
Three Ways to Deploy
GPU Colocation
Host your GPU clusters in our facilities. High-density racks, liquid cooling ready, cold-climate free-cooling. You bring the hardware, we handle everything else.
- Power-dense racks
- Direct liquid cooling
- 24/7 monitoring
Build-to-Suit
Dedicated capacity built to your specs. From 1 MW to 20 MW on grid-connected Nordic sites. We handle permitting, construction and grid interconnection.
- Custom configurations
- Grid-connected sites
- Scalable capacity
Managed Compute
We manage the full infrastructure stack. Power, cooling, network, operations. You focus on your workloads, we keep the lights on.
- Full-stack management
- SLA-backed uptime
- Flexible terms
Built for Scale,
Powered by Europe
Renewable Energy
Hydroelectric and wind power. Traceable, contractual, not offsets.
Cold Climate
Free-cooling most of the year. Designed for PUE below 1.2 without mechanical chillers.
Grid Access
Sites with existing grid connections. The hardest thing to get in Europe.
Competitive Energy
Long-term power purchase agreements on Nordic and European renewable energy. Structurally lower than Western European rates.
EU Data Sovereignty
EEA jurisdiction. GDPR-compliant. European data stays in Europe.
Scalability
Pipeline from 5 MW to 100 MW. From a single rack to a full campus.
Need compute capacity in Europe?
We're talking to AI companies, cloud providers and infrastructure operators. Tell us about your project.
Get in Touch